Humber College – Demolition & Rehabilitation

Location: Humber College – Lakeshore Campus
3199 Lake Shore Blvd. West
Toronto, ON
Scope: Review of Demolition, including sequencing, and Design of Temporary Support of Existing Structure
Year: 2008
Services Provided: Full Restoration & Construction Engineering Services including;

  • Demolition Plan & Review
  • Shoring/Re-shoring (including complex lateral bracing)
  • Underpinning
  • Steel Design
  • Inspection Services

In 2008, AJW Engineering proposed a scheme consisting of multi-type shoring systems to prevent collapse of the Humber College – Lakeshore Campus structure during its removal of floor slabs and load bearing walls while working with the general contractor responsible for the rehabilitation. AJW Engineering was retained to also review the demolition plan and underpinning design at the building. The primary challenge on this project was to develop a temporary structural lateral bracing system that would support the structure while its internal bracing had been removed. AJW Engineering proposed an external bracing method made up of HSS steel members to maintain the structural integrity of the building. While working with our client, we adapted their practical ideas and turned it into a working design. AJW Engineering works primarily with General Contractors to assist them with all their restoration and construction engineering needs in all sectors of the construction industry.

Similar Projects

  • Hospital Addition Temporary Support Requirements
    St. Mary’s Hospital, Kitchener, ON
  • Temporary Re-shoring Requirements
    University of Guelph, Guelph, ON
  • Temporary Re-shoring for Various Interior Modifications
    GM Plant, Oshawa, ON
  • Demolition & Temporary Support Requirements
    U of T: Women’s College, Toronto, ON